DTE Demo DogDEMOLITION · LEHI UT Pull a permit
Demolition & site work · permit pulled

The wreck,
always posted.

DTE DEMO DOG, L.L.C. provides demolition, excavation and site work from Lehi, Utah — two lots spanning wreck and surface work, posted on one board.

Ticket file · lot count
Lots on the board2 scopes
Service lines under them~112 lines
Total posted~118 marks
TAG·00

Two lots,
one board.

Every site line on the board posts under one of two lots.

Lot I — Wreck

Demolition & Dig

Demolition, excavation, drilling, grading, foundations and equipment rental — the wreck side of the board.

63 lines
Lot II — Surface

Paving & Site Work

Paving, fencing, masonry, signage, pools, scaffolding and specialty installation — the surface side.

49 lines
Lot Z — Total

One board

~112 lines posted across two lots — every service on the board, every permit pulled.

Posted
Lot · Rig

Crew & rig

The Lehi office runs the board — permits pulled, lots tagged, wrecks scheduled.

UT office
Lot · Fleet

Fleet

Backhoes, dozers, cranes and wreckers — the rigs that run the board.

Rig fleet
Lot · Safe

Site control

Shoring, scaffolding and safety nets — the control that keeps the board open.

Site safety
TAG·03

What the board
posts.

DTE DEMO DOG, L.L.C. keeps the board posted — and the lot is the answer, not the promise. Two scopes of site work: demolition at the head, paving and specialty at the heart.

The Lehi office runs on the board — permits pulled, lots tagged, wrecks scheduled. A line that isn't on the board isn't run; it's just a fence without a notice.

Delivery runs under the same rule — permits filed, lots wrecked, surfaces handed over. The board and the record keep the same post.

Notice · operating premise

"A site isn't cleared when the wall falls — it's cleared when the permit is on the board."

DTE DEMO D · Board rule
Brd·A02Lots on board
Brd·B~112Lines posted
Brd·C01Permit per job
Brd·DUTLehi office
TAG·04

Rules of
the board.

Three commitments posted on every permit.

Rule · 01

Posted permit

Every job is posted — lot, scope and timeline named before wrecking.

Posted entry
Rule · 02

Tagged record

Lots and wrecks live on the board — the record, not recall, is the truth.

Tagged record
Rule · 03

Handed ticket

The ticket goes to the client at close — lot, wreck and sign-off are theirs.

Client-owned

Pull the permit,
on the board.

Describe the lot, the scope and the timeline — the office answers with a written permit.

Pull a permit